Uncategorized

Calder Stewart: Milton Steel Factory 300kW Solar

March 15, 2021 4 min read
Industrial Milton Steel Factory

Calder Stewart

A 300kW solar installation powering one of New Zealand’s leading steel manufacturing facilities.

Calder Stewart Milton Steel Factory Solar Installation
300kW
System Size
680+
Solar Panels
Industrial
Sector
Milton
Location

Project Overview

Calder Stewart is one of New Zealand’s most respected names in steel manufacturing and construction. Their Milton facility partnered with Sunshine Solar to implement a large-scale 300kW solar system that significantly reduces their operational energy costs while supporting their sustainability goals.

The expansive rooftop of the steel factory provided an ideal canvas for this substantial solar array. The installation maximises energy generation during peak production hours, directly offsetting the facility’s considerable power consumption from manufacturing operations.

This project demonstrates how heavy industry can embrace renewable energy without compromising operational efficiency, setting a benchmark for sustainable manufacturing in New Zealand.

Project Highlights

  • Large-scale 300kW system ideal for industrial energy demands
  • Substantial reduction in manufacturing operational costs
  • Optimal roof utilisation on large industrial building
  • Supporting New Zealand’s transition to sustainable manufacturing

Ready for Industrial Solar?

Join Calder Stewart and other leading manufacturers. Get a free solar assessment for your industrial facility.

Request Free Assessment →

Ready to Go Solar?

Join 8,000+ Kiwi families who've made the switch with Sunshine Solar.

Free Quote